What are the distinguishing features of a good product test? Our customers return to this question again and again. We have gathered over thirty years of experience to answer this in the following summary on how to efficiently plan a successful central location test (CLT).
Formulate your research question as concretely as possible. Have you determined that a CLT is the best option for answering your question? A CLT is often used at the beginning of an innovation process, i.e., when a new product should be developed, improved, or augmented. It delivers insights into the sensory properties of a product under standardized conditions; the emphasis in comparison to other approaches is placed on the controlled environment and standardization.
Try to determine from the onset which target group you want to survey. Are you interested in the opinion of all typical consumers, or just heavy users? Keep in mind that the more narrowly defined the target group, the more costs are incurred in putting the target group together. Once the target group has been defined, the question of an appropriate sample size arises. For example, for a quick overview of the performance of a newly developed prototype (Indication testing), samples of n=80 to n=150 are often sufficient. For further analyses (e.g., preference mapping or segmentation) 200 participants is sufficient.
Select a test studio or several studios according to your relevant target markets. Do the preferences of your consumers differ within a country? Then you should divide your sample among different test studios in the relevant regions.
Which geographical location is relevant? Is it a country, city, or a high foot traffic area like a pedestrian mall? Do you need highly standardized conditions in sensory laboratories, or are normal multi-functional rooms sufficient? What equipment features do the selected test studios have to meet, e.g., a separate kitchen or special refrigeration capacity?
With the isi Test Studio Finder, you can easily find a test studio that fits your needs - worldwide.
Check it out: teststudiofinder.com
Establish a schedule for your CLT prior to the start of your study to reality check the timeline of your study. A useful method for this is backward scheduling, where your product test is planned backwards from the deadline. To create a realistic schedule, you should ask yourself the following questions:
According to our experience you need 1 week for the conception, 2 weeks for the recruitment of the target group and further preparations, 1-2 weeks for the field work depending on the sample size, 1-2 weeks for the evaluation and reporting. However, depending on the type of your study, other factors can also be included in your time planning. This is the reason why the duration of one product test can differ greatly from another product test.
isi is happy to assist you in some or all of the preceding steps. You can either directly add your required service level while booking a test studio with our project manager in our Test Studio Finder, or contact us for an individual offer on your CLT. We will surely find a solution that fits your requirements!